MEP Construction
Engineered to Endure, Designed to Inspire
Discover expert-driven solutions that combine advanced engineering, precision analysis, and creative strategy to bring your structures to life with strength, safety, and lasting impact.

DukSan Electera Plant E&I Construction
Shelbyville, TN, USA
Client / Partner
HWT
Description
Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.
Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.
Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.
Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

DukSan Electera Plant E&I Construction
Shelbyville, TN, USA
Client / Partner
HWT
Description
Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.
Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.
Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.
Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

DukSan Electera Plant E&I Construction
Shelbyville, TN, USA
Client / Partner
HWT
Description
Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.
Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.
Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.
Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

Solbrain Advanced Materials Facility
Kokomo, IN, USA
Client / Partner
HWT
Description
Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.
Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.
Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.
OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Solbrain Advanced Materials Facility
Kokomo, IN, USA
Client / Partner
HWT
Description
Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.
Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.
Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.
OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Solbrain Advanced Materials Facility
Kokomo, IN, USA
Client / Partner
HWT
Description
Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.
Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.
Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.
OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Miwon Chemical Plant Process E&I Project
Columbia, SC, USA
Client / Partner
Miwon Chem
Description
Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.
Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.
Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.
Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Miwon Chemical Plant Process E&I Project
Columbia, SC, USA
Client / Partner
Miwon Chem
Description
Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.
Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.
Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.
Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Miwon Chemical Plant Process E&I Project
Columbia, SC, USA
Client / Partner
Miwon Chem
Description
Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.
Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.
Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.
Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Kumho Tire High-Voltage
Infrastructure & Environmental Project
Macon, GA, USA
Client / Partner
Kumho Tire
Description
115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.
Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.
Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Kumho Tire High-Voltage
Infrastructure & Environmental Project
Macon, GA, USA
Client / Partner
Kumho Tire
Description
115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.
Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.
Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Kumho Tire High-Voltage
Infrastructure & Environmental Project
Macon, GA, USA
Client / Partner
Kumho Tire
Description
115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.
Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.
Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Hanhwa Advanced Materials
Expansion Project
Opelika, AL, USA
Client / Partner
Hanhwa
Description
Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.
Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.
Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.
Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

Hanhwa Advanced Materials
Expansion Project
Opelika, AL, USA
Client / Partner
Hanhwa
Description
Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.
Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.
Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.
Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

Hanhwa Advanced Materials
Expansion Project
Opelika, AL, USA
Client / Partner
Hanhwa
Description
Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.
Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.
Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.
Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

LG Hausys Viatera III
Expansion Project
Adairsville, GA, USA
Client / Partner
LG Hausys
Description
Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.
High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).
Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.
High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

LG Hausys Viatera III
Expansion Project
Adairsville, GA, USA
Client / Partner
LG Hausys
Description
Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.
High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).
Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.
High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

LG Hausys Viatera III
Expansion Project
Adairsville, GA, USA
Client / Partner
LG Hausys
Description
Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.
High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).
Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.
High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

Hankook Tire Logistics & EMS System Facility
Clarksville, TN, USA
Client / Partner
Hyundai Elevator
Description
Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.
Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.
Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.

Hankook Tire Logistics & EMS System Facility
Clarksville, TN, USA
Client / Partner
Hyundai Elevator
Description
Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.
Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.
Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.

Hankook Tire Logistics & EMS System Facility
Clarksville, TN, USA
Client / Partner
Hyundai Elevator
Description
Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.
Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.
Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.