DukSan Electera Plant E&I Construction

Shelbyville, TN, USA

Client / Partner

HWT


Description

Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.

Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.

Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.

Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

DukSan Electera Plant E&I Construction

Shelbyville, TN, USA

Client / Partner

HWT


Description

Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.

Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.

Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.

Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

DukSan Electera Plant E&I Construction

Shelbyville, TN, USA

Client / Partner

HWT


Description

Full E&I Production Line Execution: Managed the complete physical installation of Electrical and Instrumentation (E&I) systems for the hazardous battery electrolyte production line in strict accordance with NEC standards.

Precision PLC Panel Integration: Executed the rigging, anchoring, and terminal-to-terminal internal wiring of automation PLC Control Panels utilizing 100% UL-listed components.

Field Instrumentation & Loop Checks: Installed field sensors (temperature, pressure, and flowmeters), pulled high-density shielded instrumentation cables, and performed point-to-point I/O loop testing.

Local AHJ Inspection Management: Successfully hosted and passed local City Electrical Inspections for conduit bending, support spacing, and hazardous area sealings to achieve final power-on.

Solbrain Advanced Materials Facility

Kokomo, IN, USA

Client / Partner


HWT

Description

Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.

Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.

Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.

OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Solbrain Advanced Materials Facility

Kokomo, IN, USA

Client / Partner


HWT

Description

Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.

Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.

Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.

OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Solbrain Advanced Materials Facility

Kokomo, IN, USA

Client / Partner


HWT

Description

Heavy-Duty PLC Deployment: Positioned, mounted, and secured heavy-duty automated control panel enclosures, routing heavy-gauge power feeders to support advanced chemical material processing lines.

Corrosive-Environment Instrumentation: Fabricated and installed specialized stainless steel junction boxes and Teflon-coated rigid conduits designed to withstand chemical vapor and corrosive field elements.

Field I/O Verification & Debugging: Conducted thousands of field I/O point-to-point continuity tests between the main PLC termination cabinets and automated field valves/pumps.

OSHA Zero-Energy Safety Management: Enforced strict OSHA-compliant Lockout/Tagout (LOTO) protocols during high-risk physical tie-ins and panelboard energization phases.

Miwon Chemical Plant Process E&I Project

Columbia, SC, USA

Client / Partner

Miwon Chem


Description

Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.

Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.

Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.

Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Miwon Chemical Plant Process E&I Project

Columbia, SC, USA

Client / Partner

Miwon Chem


Description

Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.

Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.

Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.

Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Miwon Chemical Plant Process E&I Project

Columbia, SC, USA

Client / Partner

Miwon Chem


Description

Chemical Reactor Power Infrastructure: Installed and terminated heavy-duty power lines for high-temperature/high-pressure chemical reactor vessels, heavy utility pumps, and industrial agitator motors.

Class I/II Explosion-Proof Wiring: Executed specialized hazardous-area wiring (NEC Class I/II, Division 1 & 2), including the precise application of Chico sealing compounds to eliminate volatile gas migration through conduits.

Utility & Solenoid Valve Interlocking: Wired and integrated automated utility lines (steam, cooling water, gas) and chemical feed solenoid valves into the plant’s central monitoring system.

Static-Prevention Bonding Grid: Built a comprehensive physical grounding and bonding network across all steel reactor tanks, metal pipe racks, and structural elements to eliminate static fire risks.

Kumho Tire High-Voltage
Infrastructure & Environmental Project

Macon, GA, USA

Client / Partner


Kumho Tire

Description

115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.

Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.

Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Kumho Tire High-Voltage
Infrastructure & Environmental Project

Macon, GA, USA

Client / Partner


Kumho Tire

Description

115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.

Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.

Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Kumho Tire High-Voltage
Infrastructure & Environmental Project

Macon, GA, USA

Client / Partner


Kumho Tire

Description

115kV Turnkey Substation Construction: Handled the heavy mechanical rigging, concrete pad anchoring, and high-voltage termination of a massive 115kV substation, including main transformers, GIS, and switchgears.

Plant-Wide HV/LV Distribution Network: Installed expansive high-overhead aluminum cable trays and pulled large-scale kcmil/AWG power cables connecting the main substation to multiple facility sub-stations. Automated Curing System Wiring: Executed full electrical routing and sensor integration for heavy automated tire curing (vulcanization) lines, managing high-temperature operational wiring environments.

Heavy Environmental System Tie-ins: Managed the complete E&I installation for massive environmental air-cleaners, including heavy fan motors, VFD panel installations, and sensing logic for Bag Filters and Wet Scrubbers.

Hanhwa Advanced Materials
Expansion Project

Opelika, AL, USA

Client / Partner

Hanhwa


Description

Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.

Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.

Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.

Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

Hanhwa Advanced Materials
Expansion Project

Opelika, AL, USA

Client / Partner

Hanhwa


Description

Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.

Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.

Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.

Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

Hanhwa Advanced Materials
Expansion Project

Opelika, AL, USA

Client / Partner

Hanhwa


Description

Turnkey Extension Building Electricals: Executed the entire electrical infrastructure for the new building extension, including main switchboards, localized panelboards, industrial LED high-bays, and utility power outlets.

Heavy Equipment (EQ) Power Routing: Engineered and routed optimal overhead cable trays and drop conduits to deliver stable multi-voltage power to newly introduced heavy manufacturing machinery.

Foreign Equipment NEC Retrofitting: Modified imported Asian/European manufacturing machinery on-site, swapping out non-compliant breakers and rewiring terminals with UL-listed components to align with local codes.

Multi-Stage Building Inspections: Managed and successfully cleared both Rough-In Inspections (prior to drywall closure) and Final Inspections with local building inspectors.

LG Hausys Viatera III
Expansion Project

Adairsville, GA, USA

Client / Partner


LG Hausys

Description

Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.

High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).

Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.

High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

LG Hausys Viatera III
Expansion Project

Adairsville, GA, USA

Client / Partner


LG Hausys

Description

Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.

High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).

Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.

High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

LG Hausys Viatera III
Expansion Project

Adairsville, GA, USA

Client / Partner


LG Hausys

Description

Heavy Engineered Stone Production Power: Installed high-amperage industrial bus ducts and heavy overhead power feeders to support massive material blenders, molding presses, and automated stone slab polishing lines.

High-Capacity Transformer & Panelboard Setup: Positioned and physically completed heavy terminations for stepping-down utility transformers and main distribution switchboards (480V/277V/120V).

Heavy Dust-Resistant NEMA 12 Construction: Applied dust-ignition proof fittings and NEMA 12 sealed junction boxes across all stone-crushing and mixing zones to prevent high-density silica dust from causing electrical shorts.

High-Elevation OSHA Fall Safety Control: Directed high-altitude conduit installation using boom/scissor lifts, enforcing rigorous OSHA fall-protection, tie-off mandates, and structural integrity checks.

Hankook Tire Logistics & EMS System Facility

Clarksville, TN, USA

Client / Partner

Hyundai Elevator


Description

Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.

Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.

Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.

Hankook Tire Logistics & EMS System Facility

Clarksville, TN, USA

Client / Partner

Hyundai Elevator


Description

Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.

Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.

Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.

Hankook Tire Logistics & EMS System Facility

Clarksville, TN, USA

Client / Partner

Hyundai Elevator


Description

Plant-Wide EMS Infrastructure Implementation: Installed advanced digital smart meters across all main facility distribution boards, wiring communication links back to the central Energy Management System server.

Automated Warehouse AS/RS Layout Wiring: Assembled and precisely aligned heavy overhead conductor bars (Trolley/Festoon systems) along high-bay stacker crane rails for automated warehouse operation.High-Density Conveyor & Sorting System Wiring: Wired kilometers of automated sorting conveyor networks, tying hundreds of drive motors, photo-eye sensors, and Emergency Stop (E-Stop) loops into the main control grid.

Cross-Functional Construction Coordination: Directly synchronized with structural engineers, mechanical millwrights (Hyundai Elevator), and general contractors to prevent structural interferences and optimize electrical containment paths.

© 2026 C&Y Engineering. All rights reserved. Use of this site constitutes acceptiance of our User Agreement and Privacy Policy.
The material on this site may not be reproduced, distributed, transmitted, cached, or otherwise used, except with the prior written permission of C&Y Engineering.

© 2026 C&Y Engineering. All rights reserved. Use of this site constitutes acceptiance of our User Agreement and Privacy Policy.
The material on this site may not be reproduced, distributed, transmitted, cached, or otherwise used, except with the prior written permission of C&Y Engineering.

© 2026 C&Y Engineering. All rights reserved. Use of this site constitutes acceptiance of our User Agreement and Privacy Policy.
The material on this site may not be reproduced, distributed, transmitted, cached, or otherwise used, except with the prior written permission of C&Y Engineering.